West Rand · Aircrete in development

Better blocks start
with proof.

We’re developing locally made foamed-concrete blocks for West Rand builders. Small batches, documented testing, and real contractor input come before commercial production.

Development-stage product. Not yet approved for construction use.

AeroBlock hero
Local ambition. Measured progress.Gauteng, South Africa

Our commitment

Evidence, not empty claims.

  • Documented trial batches
  • Independent testing before launch
  • Honest pricing and use limits

01 / The development process

One block.
Every detail considered.

Aircrete combines cement slurry with controlled foam. Our pilot will investigate whether a repeatable formulation can meet a suitable specification at a viable installed-wall cost.

Proposed trial format

390 × 190 × 140 mm

Experimental dimensions, not a final product specification.

01

Listen to local builders

Understand the sizes, strengths, quantities, and delivered prices contractors actually need. The starting point is a buyer problem—not a production machine.

02

Make small. Measure carefully.

Develop three trial mixes, label samples, and record material quantities, foam density, curing conditions, dimensions, and rejected blocks.

03

Test before making promises

Seek suitable laboratory testing for strength and absorption. A qualified specialist must establish the relevant specification and permissible applications.

04

Scale only when the evidence holds

Compare complete wall costs and confirm consistent batches, a compliance pathway, financing, and qualified buyer interest before a commercial launch.

The first 90 days

Pilot targets, not achieved results. Progress depends on each technical and commercial gate.

20
Buyer conversations
3
Documented trial mixes
2
Conditional buyer leads

02 / Built around your requirements

A useful block starts
with a useful conversation.

Building in Krugersdorp, Kagiso, Randfontein, or nearby? These are the questions guiding our buyer research. There are no commercial orders or confirmed prices at this stage.

West Rand, Gauteng

The builder brief
Three questions before we make more blocks.

01What block size, strength, and intended application does your project require?

02How many blocks do you buy, where do you build, and what is your current delivered cost?

03Which test reports and approvals would you need before considering a new material?

Your requirements inform the pilot. They are not a purchase commitment, and prototype blocks should not be used in construction.

Proof first. Orders later.

Help define what comes next.

The next milestone isn’t a bigger factory. It’s a tested, repeatable block that meets a real builder’s needs.

Review the builder brief